The Ranjankhol project utilizes water from the Source Pravara Left Bank Canal. It features a canal intake structure, a balancing tank, and pumping machinery for both raw and treated water. This comprehensive approach ensures efficient water transportation and treatment, providing a reliable and sustainable water supply to the residents of Ranjankhol.
Client : Yash Engineering Consultants Private Limited
Source : Pravara Left Bank Canal
Cost : 107279581 Rs.
Capacity : WTP 10.5 MLD
Total Length : 1,08,153 m(Dia. 75 – 180 mm HDPE 6 Kg/cm)